Building work | Bricklaying
Ellesmere Port - CH66
Enquiry from: Nayde M
Start Date: Immediate
Garden wall for back garden.
Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with one or two windows is added to the front or side of the house.
This solid wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they might require supplemental insulation. Normally, this is achieved by adding internal wall insulation like insulated plasterboard, or by adding an extra layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.
Contrary to lots of beliefs, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can possibly think about. A solitary bricklaying tasks requires a large array of abilities. Let's look at these abilities!
This is not simply an aesthetic decision, as coordinating with existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will supply up to 4 Bricklayers pros in your area, who will use quotations for the job you desire done. You'll get a property visit from specialists in Ellesmere Port that'll help you to pick the appropriate Bricklayers for your home prior to performing the installment. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Ellesmere Port in May 2025
Requests for Bricklayers quotations in Ellesmere Port in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in Merseyside in May 2025. 0% change from April 2025.
Ellesmere Port is the sizeable industrial town and port in Cheshire towards the west of England, and has now a population of 64,100. The tourism in Ellesmere keeps growing with a number of visitor destinations and much more property estates and shops have been built. For the house developments in Ellesmere, be sure to make use of vetted experts to get the correct price along with a good quality of work.
Ellesmere Port - CH66
Enquiry from: Nayde M
Start Date: Immediate
Garden wall for back garden.
Ellesmere Port - CH65
Enquiry from: Debbie A
Start Date: Immediate
repointing to part of small semi detached house how much work would you say needs to be done: lots of work property type: commercial
Ellesmere Port - CH66
Enquiry from: Steve M
Start Date: Immediate
garage conversion : at stage where the exising garage door area requires block, brickwork and window etc. approx size of opening 2.5m x 4.0m are you the property owner: owner of the property how much ...
Chester - CH3
Enquiry from: James B
Start Date: Immediate
repointing, small job half a day. are you the property owner: owner of the property property type: commercial how much work would you say needs to be done: small job do you require the bricks to be s...
Tarporley - CW6
Enquiry from: Jeff N
Start Date: Immediate
new build house one wing blockwork ecternal for timber cladding and one wing handmade cheshire brick. please give jeff norris a call on ***. thanks are you the property owner: owner of the property p...
Frodsham - WA6
Enquiry from: Gillian B
Start Date: Immediate
need a bricklayer to create door ways and to construct downstairs toilet are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small j...
Chester - CH4
Enquiry from: Stuart F
Start Date: Immediate
we have a 20m existing brick wall in our garden and wish to extend it upwards using reclaimed bricks. are you the property owner: owner of the property property type: detached how much work would you ...
Northwich - CW8
Enquiry from: Robert T
Start Date: Immediate
some re pointing around the outside walls. are you the property owner: owner of the property property type: detached how much work would you say needs to be done: minor works how much work would you s...
Frodsham - WA6
Enquiry from: Danny J
Start Date: Immediate
Block work wall required rear garden
Deeside - CH5
Enquiry from: BEVERLEY G
Start Date: Immediate
Brick steps to the front of house to be removed and rebuilt
Chester - CH4
Enquiry from: Vicky H
Start Date: Immediate
Require quotes to build a garden wall 6ft high / 14.5 ft length. Double skin and remove existing fencing pannels. All materials required. Home owner Please call to appoint
Buckley, Mold - CH7
Enquiry from: G H
Start Date: Immediate
Home owner Build a small break wall around the front of the property Time scale 3-6months Contact to Appoint *
Frodsham - WA6
Enquiry from: Julie R
Start Date: Immediate
Are you the property owner: Owner of the property Garden brick wall 9ft tall 15-20 metres length Please contact to appoint
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ellesmere Port.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today