Bricklaying in Smethwick

Obtain Bricklaying Prices in Smethwick

Home > General Building Projects > Bricklayers > Smethwick

Bricklaying in Smethwick

Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the house.

 

This brick wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they might require extra insulation. This is usually achieved with the addition of interior wall insulation like insulated plasterboard, or by adding another layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if the walls are shared with a neighbouring property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.

 

As opposed to lots of ideas, a bricklayer really does greater than laying of bricks. There's even more to being a bricklayer than you can most likely think about. A solitary bricklaying tasks requires a large range of abilities. Let's have a look at these skills!

  • Making use of moist resistant materials to seal foundations.
  • Spreading out mortar between joints and using them to act as a thick layer binding the blocks with each other in rows.
  • Checking out and working from specs as well as plans.
  • Dealing with brick-cutting devices.
  • Taking charge and also caring for cement blocks or bricks, clay bricks and also the sort.
  • Construction of scaffolding - based on belongings of some licenses in some states.

This is not just an cosmetic decision, as matching existing brickwork might be a condition of planning permission or building regulations in your area. We will give approximately four Bricklayers pros in your area, who will certainly offer quotations for the job you want done. You'll obtain a property visit from experts in Smethwick who'll aid you to select the ideal Bricklayers for your house before performing the installation. Enter your postal code to begin looking currently.

Average Bricklayers cost in Smethwick

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Smethwick, as reported by local LeadsDoWork members.

Bricklayers installation cost in Smethwick 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in June 2025

Bricklayers Projects in Smethwick in May 2025

1,560

Requests for quotations in Smethwick in May 2025

0

Requests for Bricklayers quotations in Smethwick in May 2025. 0% change from April 2025.

0

Requests for Bricklayers quotations in West Midlands in May 2025. 0% change from April 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Smethwick May 2025

Smethwick

Smethwick is a town situated in the Sandwell Metropolitan Borough in West Midlands, bordering Birmingham to the east. Smethwick features a populace of 48,180, and it's close by to settlements including Bearwood, The Uplands, Black Patch and Galton Village. If perhaps you're planning to transform your household and increase value, ensure to use vetted specialists within Smethwick and make sure an excellent price and quality finish.

Looking for Bricklayers in Smethwick?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Smethwick

14 Jun

Building work | Bricklaying

Smethwick - B66

Enquiry from: Ian T

Start Date: 1 to 3 months

To construct a long set of steps leading from a car park to the front of our office reception area. Are you the property owner: Owner of the property Property Type: Commercial How much work woul...

Post a similar request >

04 Aug

Building work | Bricklaying

Solihull - B94

Enquiry from: Samantha S

Start Date: Immediate

I have and extension damp course had been done need a quote for brick work 4000 bricks estimated , install ground floor steels and walls labour only as I have the material

Post a similar request >

22 May

Building work | Bricklaying

Kidderminster - DY11

Enquiry from: Gill U

Start Date: Immediate

need a garden wall built ab*** high and 72 ft length. labour only l will supply all materials are you the property owner: owner of the property are you the property owner: relative of owner are you th...

Post a similar request >

25 Apr

Building work | Bricklaying

Kidderminster - DY10

Enquiry from: Razu M

Start Date: 1 to 3 months

Build Brick entrance wall Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your garden: Unsure Garden Type: Front garden Do you have a design: No, but...

Post a similar request >

01 Apr

Building work | Bricklaying

Kidderminster - DY11

Enquiry from: Johnie. W

Start Date: Immediate

Need a competent bricklayer to add to our existing,,fireplace ,200bricks???thereabouts in a herringbone pattern,,

Post a similar request >

04 Jan

Building work | Bricklaying

Redditch - B97

Enquiry from: D

Start Date: Immediate

Wall re-build approx 12 ft wide by 5 ft high. Are you the property owner: Tenant (with permission) Property Type: Commercial How much work would you say needs to be done: Medium job Do you require t...

Post a similar request >

10 Mar

Building work | Bricklaying

Birmingham - B45

Enquiry from: Brian W

Start Date: Immediate

replace approx. 8 bricks to a pillar & make good (replace) bricks to the house there was a arch which fell down Homeowner Please contact to appoint

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Smethwick

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Smethwick.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Smethwick

Customer Reviews

Overall rating:


Smethwick Bricklayers installers are rated 4.9 out of 5 based on 1 reviews of 19 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Smethwick Bricklayers contractors

Are you a builder in Smethwick?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today