Building work | Bricklaying
Watford - WD25
Enquiry from: Kaloyan H
Start Date: Immediate
I need someone to build up garden wall (instead of fence panel)
Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a solid wall with one or two windows is added to the front or side of your home.
This brick wall will require foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they may require supplemental insulation. Normally, this is done by adding interior wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.
In contrast to lots of beliefs, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can most likely think of. A single bricklaying jobs calls for a wide variety of abilities. Allow's have a look at these skills!
This is not simply an cosmetic decision, as complementing existing brickwork might be a requirement of planning permission or building regulations in your area. We will offer up to 4 Bricklayers pros locally, that will certainly supply quotes for the job you want done. You'll receive a home visit from specialists in Watford who'll help you to pick the right Bricklayers for your home before carrying out the installation. Enter your postcode to begin looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Watford in May 2025
Requests for Bricklayers quotations in Watford in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in Hertfordshire in May 2025. 0% change from April 2025.
The town and borough of Watford, in Hertfordshire, is only eighteen miles north west of central London and inside the M25 boundaries. However, the borough is kept independent from the Greater London region, but its sizeable population of 80,000 nevertheless provides it a density of 9,600 individuals per square mile. Included in the Watford postcode district are nearby areas Croxley Green, Rickmansworth, Carpenders Park and South Oxhey. To get the best house enhancement quotes from respected companies in Watford, you'll want to make use of our totally free and effortless service.
Watford - WD25
Enquiry from: Kaloyan H
Start Date: Immediate
I need someone to build up garden wall (instead of fence panel)
Watford - WD25
Enquiry from: Maria M
Start Date: 1 to 3 months
30foot breeze block wall to build have blocks already Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium job Do you req...
Watford - WD25
Enquiry from: John C
Start Date: Immediate
Extension around 110m2 of block required Please contact to appoint
High Wycombe - HP15
Enquiry from: Nick R
Start Date: Immediate
Small 2 brick pillar (14 courses high) knocked over by a numpty in a van (probably). I have the sand and cement - just too much to do and I'm a rubbish brickie.
High Wycombe - HP13
Enquiry from: Mohammad S
Start Date: Immediate
approximately 30 metres of block wall in rear garden with pillars for fence to slot in are you the property owner: owner of the property property type: detached how much work would you say needs to be...
Chalfont St. Giles - HP8
Enquiry from: Angus M
Start Date: Immediate
we are the main contractor on the project to demolish and rebuild the above. we have a requirement for a blockwork contractor within the next 10 days we would like to it local are you the property ow...
Berkhamsted - HP4
Enquiry from: David B
Start Date: Immediate
i need a quote for an insurance claim. the end of a low wall along my drive has been dislodged and needs to be re-instated. this is a small job - only about a dozen bricks but with a power cable for a...
Slough - SL2
Enquiry from: Nina H
Start Date: Immediate
various brick work needed are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be supplied to...
Chesham - HP5
Enquiry from: Michael H
Start Date: Immediate
build a new 9 inch garden wall approximately 50m long and 18 bricks high with pillars every 5m. i will clear the existing hedge and dig foundations and supply all materials but would like you to suppl...
High Wycombe - HP10
Enquiry from: Anna R
Start Date: Immediate
garden retaining wall (eight bricks high) 7.5m x 5.5m to incorporate a small raised patio 2.5 x 2.3m. the wall is on a slope and the area is to be backfilled with soil for bedding plants. are you the...
High Wycombe - HP15
Enquiry from: Stephen C
Start Date: 1 to 3 months
To install a metal handrail alongside 20 steps to my house and to repoint and recement some of the bricks on the steps and wall alongside (plus small area of repointing - about one quarter sq meter ...
Berkhamsted - HP4
Enquiry from: S
Start Date: Immediate
Bricklayer required to complete a double garage project - rear wall and side wall each 6m long by 2.7m high (bungalow) with 100mm cavity. Mixed London yellow stock bricks external and standard block i...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Watford.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today