Bricklaying in Northamptonshire

Find Bricklaying Prices in Northamptonshire

Home > General Building Projects > Bricklayers > Northamptonshire

Bricklaying in Northamptonshire

Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of your home.

 

This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the exterior brickwork walls, they may require additional insulation. Normally, this is achieved with the addition of internal wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.

 

Contrary to several beliefs, a bricklayer in fact does more than laying of blocks. There's more to being a bricklayer than you can most likely think about. A solitary bricklaying tasks requires a broad selection of skills. Allow's have a look at these abilities!

  • Utilizing damp resistant materials to seal structures.
  • Spreading out mortar between joints and also applying them to work as a thick layer binding the blocks with each other in rows.
  • Reviewing as well as functioning from specs in addition to plans.
  • Collaborating with brick-cutting makers.
  • Taking charge and caring for cement blocks or bricks, clay bricks as well as the likes.
  • Building and construction of scaffolding - based on belongings of some licenses in some states.

This is not simply an visual choice, as complementing existing brickwork is possibly a condition of planning permission or building regulations in your area. We will offer as much as four Bricklayers pros locally, who will certainly provide quotes for the work you desire done. You'll receive a property visit from specialists in Northamptonshire who'll help you to choose the best Bricklayers for your residence prior to carrying out the installment. Enter your postcode to begin browsing currently.

Average Bricklayers cost in Northamptonshire

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Northamptonshire, as reported by local LeadsDoWork members.

Bricklayers installation cost in Northamptonshire 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in June 2025

Bricklayers Projects in Northamptonshire in May 2025

18,550

Requests for quotations in Northamptonshire in May 2025

0

Requests for Bricklayers quotations in Northamptonshire in May 2025. 0% change from April 2025.

0

Requests for Bricklayers quotations in East Midlands in May 2025. 0% change from April 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Northamptonshire May 2025

Bricklayers near you

Northamptonshire

The County of Northamptonshire features a population of 692,000, which makes it the 33rd ranked region in the UK. Northamptonshire borders 8 other counties, possessing the county town of Northampton as well as other important towns which include Kettering, Corby, Rushden and Daventry. The county carries a fairly small population density of only 750 people per square mile. For the household enhancements you're taking into consideration within the East Midlands county of Northamptonshire, ensure to work with trustworthy experts in your local area.

Looking for Bricklayers in Northamptonshire?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Northamptonshire

16 Apr

Building work | Bricklaying

Rushden - NN10

Enquiry from: Ake K

Start Date: Immediate

a small wall to be knocked down and replace. are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the brick...

Post a similar request >

16 Mar

Building work | Bricklaying

Kettering - NN16

Enquiry from: Tilly D

Start Date: Immediate

looking for partly brick boundary wall to be put up around the home. are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job ...

Post a similar request >

08 Feb

Building work | Bricklaying

Daventry - NN11

Enquiry from: John G

Start Date: Immediate

front wall of house needs some repair, two brick piers need to be built and pillar caps attached. i have the materials to do so, just need someone to carry out the work. are you the property owner: ow...

Post a similar request >

30 Jan

Building work | Bricklaying

Kettering - NN16

Enquiry from: Cassa M

Start Date: Immediate

site work, 4 new detached houses. are you the property owner: owner of the property property type: detached how much work would you say needs to be done: lots of work do you require the bricks to be s...

Post a similar request >

21 Nov

Building work | Bricklaying

Rushden - NN10

Enquiry from: Cherill P

Start Date: Immediate

repointing chimmely replacing flashing are you the property owner: owner of the property property type: other how much work would you say needs to be done: medium job do you require the bricks to be ...

Post a similar request >

02 Sep

Building work | Bricklaying

Wellingborough - NN29

Enquiry from: Stewart W

Start Date: Immediate

bricking up external wall after removal of back door and window. approx 2m x1.5m and internal wall are you the property owner: relative of owner property type: semi detached how much work would you s...

Post a similar request >

05 Aug

Building work | Bricklaying

Northampton - NN5

Enquiry from: Ian A

Start Date: Less than one month

pointing of side wall to semi- detached bungalow. are you the property owner: owner of the property what type of work do you need to have done: brick work do you have the materials you need in order f...

Post a similar request >

08 Jun

Building work | Bricklaying

Northampton - NN3

Enquiry from: Zelda B

Start Date: Immediate

completely rebuild a garden a demolished garden wall are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you requi...

Post a similar request >

01 Jun

Building work | Bricklaying

Wellingborough - NN9

Enquiry from: Jane F

Start Date: Immediate

brick bbq for my husband are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small job do you require the bricks to be supplied too...

Post a similar request >

05 Apr

Building work | Bricklaying

Wellingborough - NN8

Enquiry from: Jonnies A

Start Date: Immediate

brickwork, remove garage door and put bricks and window are you the property owner: relative of owner property type: semi detached how much work would you say needs to be done: medium job do you requi...

Post a similar request >

04 Apr

Building work | Bricklaying

Daventry - NN11

Enquiry from: Dagnis B

Start Date: Immediate

reiking out and repointing chimney and walls. like to get quotes for now as purchasing property and like to know what expence to expect before exchanging contracts. are you the property owner: owner o...

Post a similar request >

15 Nov

Building work | Bricklaying

Kettering - NN14

Enquiry from: Bibin M

Start Date: Immediate

to replace few bricks and repair the facing wall caused by a car accident. are you the property owner: relative of owner property type: detached how much work would you say needs to be done: small job...

Post a similar request >

27 Sep

Building work | Bricklaying

Wellingborough - NN29

Enquiry from: Richard B

Start Date: Immediate

Rebuild three brick piers supporting boundary fence panels Property Type: Detached Are you the property owner: Owner of the property Time scale: 1-3 months

Post a similar request >

03 Aug

Building work | Bricklaying

Northampton - NN3

Enquiry from: Brenda B

Start Date: Less than one month

build basic brick retaining wall 6ft long by 2ft high Are you the property owner: Owner of the property Do you require the bricks to be supplied too: Yes Property Type: Detached How much work would yo...

Post a similar request >

19 Jan

Building work | Bricklaying

Kettering - NN16

Enquiry from: Mark E

Start Date: Less than one month

Extension wall Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the bricks to be supplied too: No Time ...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Northamptonshire

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Northamptonshire.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Northamptonshire

Customer Reviews

Overall rating:


Northamptonshire Bricklayers installers are rated 4.3 out of 5 based on 4 reviews of 24 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Northamptonshire Bricklayers contractors

Are you a builder in Northamptonshire?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today