Bathroom | Fitting
Keith - AB55
Enquiry from: E
Start Date: Immediate
Refit a bathroom, bath with shower, sink, toilet with cabinets, tiling partially and flooring. Thank you.
On the lookout for bathroom fitters in Keith? Our bathroom fitters within Keith are able to offer you the top quotes for having bathrooms fitted.
Every house needs a bathroom which looks good whilst also having a calming feel to it. However, lots of properties are lumbered with a little space, or have worn out units and old appliances.
Refurbishing a bathroom is a superb way to solve these issues and taking the suggestions and expertise of a expert is often the ideal way to go about things.
With a lot of plumbing needed for accessories like toilets, showers and sinks, you'll need to call on a specialist plumber to complete the installation. You'll also need a expert if you plan on rewiring the electrics too.
No matter whether you use the exact same space as before or extend the bathroom, it's most likely you'll require part or the entire installing completed by an expert.
We'll offer you up to four bathroom contractors in the area, who can offer quotations for the installation. You'll get a property visit from experts in Keith who'll supply and install the bathroom for a good price.
The common cost of Shower installation is £1362.5. Costs vary based upon the materials and the firm hired. The upper price range can be as high as £1635. The material costs are in general around £50
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£1800
£1350
£900
£450
£0
Labour cost | £1,225 | |
Material cost | £50 | |
Waste removal | £88 |
Requests for quotations in Keith in April 2025
Requests for Shower installation quotations in Keith in April 2025. 0% change from March 2025.
Requests for Shower installation quotations in Banffshire in April 2025. 0% change from March 2025.
Keith is a town in the Moray council location in north east Scotland. It has a population of 4,734. Until 1975 it remained in Banffshire, a name which continues typical usage as well as historic referrals. Keith has 3 distinctive areas: Old Town, where the original settlement was first developed; Keith which is the primary commercial centre and Fife Keith which was originally a separate town constructed in competitors by the Earl of Fife however which, having proved much less economically successful, was ultimately joined to form one uniform negotiation separated now only by the river. The oldest part of Keith days to around 1180 where the Old Town still remains, currently practically tantamount from the rest of the town. It created around the old bridge which was developed there by 2 mourning moms and dads as a long-term memorial to their dear youngster who drowned in the river at that going across factor in the hope that none should experience similar loss. The almost all of the town gets on greater ground above the river, laid out around 1750 by the Earl of Findlater. It lies at the crossing of the A95 as well as A96 roads. Local services include a health centre, dental professional, optician as well as multiple hairdressing salons. The town has 3 colleges: Keith Grade school, Keith Primary School as well as St Thomas RC Primary School. The annual Keith Country Show, held at Seafield Park, is an occasion in the farming calendar of north-east Scotland. Newmill is a tiny hamlet about 1 mile (1.6 km) north of Keith. Dating from the very early 18th century, the settlement was built to home the employees from the neighboring dish mill constructed by Bishop Crystall, on the financial institutions of the river Isla. It currently has a Pub and also prominent Chinese restaurant and take-away, in addition to Newmill Primary School.
Keith - AB55
Enquiry from: E
Start Date: Immediate
Refit a bathroom, bath with shower, sink, toilet with cabinets, tiling partially and flooring. Thank you.
Huntly - AB54
Enquiry from: Lesley W
Start Date: Immediate
old bath taken out and new shower installed
Fochabers - IV32
Enquiry from: Stewart G
Start Date: Less than one month
Proposed en-suit shower room. Require 10mm Twin and earth shower cable and 45amp mcb to be connected to consumer box about 25 mts cable required. Additionally connect 15mm copper pipe to cold water ...
Answer a few quick questions, so we can match you with local plumbers who can help.
Get free, no-obligation local shower installation quotes from 4 verified plumbers working in Keith.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Fitting a new bathroom can be a strenuous and very complicated task which usually comes with serious financial implications. But even more importantly, you’re most likely going to be working tight to a time schedule. So you’d like to know how soon you can have your bathroom space back and ready to use. This mostly either because you’re really impatient to see how your new bathroom will turn out to be or because you do not really fancy using another bathroom for long pending the time your new bathroom is being fitted and we definitely do not blame you. Having your bathroom back new and sparkling can be the best feeling ever and all professionals seek to get the job done as soon as they possibly can.
Overall, one thing that everyone would need to consider is mainly setting realistic expectations. Giving an accurate time it’ll take to complete the installation of your bathroom is almost impossible as there are many factors that can play a huge role in that. These factors include the size of the project as well as the design’s complexities, materials to be used and any other special requirements in the project. As a result, while 5 days is the average number of days it’ll take for the professional installation of a new bathroom, this can vary depending on the size of your bathroom and more. And you would have guessed, a smaller bathroom will require less number days when compared to a bigger bathroom with the same design. Also, designs can go a long way to determine the duration of a bathroom installation project with complex ones requiring more days as compared to simpler designs.
If you’re about to fit a new bathroom in your home, then you’d probably be wondering how much would be the labour cost of getting it done. Unfortunately, a single accurate answer can not be provided to this question as there are many influencing factors that can determine the labour cost to fit a new bathroom. In this guide, we’ll give you a good insight on the labour cost of installing a new bathroom.
While you can obtain a good evaluation when planning the work on your bathroom, the final cost can largely vary. For small jobs such as fitting a pedestal basin with taps, professional installers can charge within the range of £170 to £250. Meanwhile, bigger projects such as tiling an entire bathroom can cost an average fee of about £70 to £90 per square metre. Generally, the overall average cost of fitting a new bathroom is about £6,500 in the UK. But in an event whereby you’ll be switching to a bathroom suite that’s exactly like the old one which wouldn’t require extra flooring as well as tiling, there’s a high chance you may be able to complete the project for a significantly lesser price.
The main reason why the labour costs vary is due to the fact that each individual job will have to be priced based on its own particular requirements and circumstances. Other influencing factors that’ll affect how easy a job is to complete, how much material will be incorporated and the duration of the project includes the size of the bathroom in question as well as the shape. However, there can be unforeseen complications like damaged piping which will also raise the price of the project and more.
Is your bathroom sink damaged or old and looking fragile? If yes, then you’re most likely interested in fitting a new one as soon as possible. So how do you go about the installation of a new bathroom sink? This is one of the most frequently asked questions when it comes to bathroom sinks and for a good reason. The fact is, if you’re DIY competent, then this is a task that shouldn’t give you too many hard times. However, if you’re without a proper training or experience, we’d recommend hiring the services of a plumber to guarantee the best results as save yourself some time and additional money which may result from costly errors. In this guide, you’ll learn the steps to bathroom sink installation.
✓ Tap preparation. Apply a small amount of plumber’s mate putty to the base of the taps to be installed.
✓ Install the taps. Identify the taps holes in the sink and squeeze the taps firmly in place, fit the washers and back nuts to the sink’s underside.
✓ Wipe off excess putty. Use a suitable tool to wipe off excess putty that has been pressed out by the tap.
✓ Install the wastage drain. Fit the wastage drain easily into the sink in such a way that the back and front (not side to side) is faced by the two wastage holes.
✓ Tighten the wastage pipe. Squeeze the wastage pipe in, include the washer on the opposite side as well as the nut. Tighten properly with an adjustable spanner and wipe off excess put using a screwdriver or any suitable tool.
✓ Fit the sink to the wall. Put the bolts in position before hanging the sink. Once done, then bolt the sink to the wall and tighten the nut with an adjustable spanner.
✓ Ensure that it’s level with the help of a spirit level.
Once you have your new bathroom installed, or perhaps you’re only replacing the old downlights, you’d probably want to know how to go about fitting your new bathroom downlights. If yes, then you’re not alone! This is a very common question amongst several homeowners and we wish to guide you through once and for all. However, it must be said that if you are not a competent DIYer or probably lack the confidence or skills to pull this off, then it’s advisable to hire a professional to get the best results and also save yourself some money and time.
Here are the list of the tools you’ll need to fit your bathroom downlights: Tape measure, chalk line or laser, pencil, pad saw, hand drill, hole saw and screw drivers.
✓ Measure the bathroom ceiling and mark out the central point of the light which will be where the downlights will be placed. Drill a small pilot hole here.
✓ Check above the ceiling to ensure that there’s no pipes, joists or wires in the way. It’s always a good practice to make sure that there’s sufficient room around where the downlight is to be installed in order to avoid placing it too close to a joist or any other obstacle. You should try as much as possible to maintain a 6 inch gap around the spot where the downlight is placed to make sure the fitting does not overheat.
✓ Use a hole saw or a plasterboard saw to make the cut out for the downlight. Check the downlight’s box for instruction on the size.
✓ Once you’ve been able to make a clean cut ceiling hole, pull through the wiring through the hole so that the downlight can be wired. Once done, then you can fit the downlight into the hole by holding the two springs back against the sides of the downlighter and push up into the hole.
We can help you get more shower installation work with our qualified job leads and boost your business.
Join today