Bricklaying in Ballynahinch

Compare Bricklaying Prices in Ballynahinch

Home > General Building Projects > Bricklayers > Ballynahinch

Bricklaying in Ballynahinch

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the house.

 

This brick wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they'll require extra insulation. This is usually achieved by adding internal wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the house.

 

In contrast to several beliefs, a bricklayer actually does more than laying of blocks. There's even more to being a bricklayer than you can most likely think about. A solitary bricklaying jobs requires a vast variety of skills. Allow's take a look at these abilities!

  • Utilizing wet resistant materials to seal structures.
  • Spreading mortar between joints and also applying them to work as a thick layer binding the bricks together in rows.
  • Reviewing and functioning from requirements as well as plans.
  • Dealing with brick-cutting devices.
  • Taking charge and caring for cement blocks or blocks, clay bricks and the sort.
  • Building of scaffolding - subject to possession of some licenses in some states.

This is not only an visual choice, as complementing existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will provide approximately 4 Bricklayers pros locally, who will certainly offer quotes for the work you want done. You'll receive a home visit from specialists in Ballynahinch who'll aid you to pick the right Bricklayers for your house prior to performing the setup. Enter your postcode to start looking currently.

Average Bricklayers cost in Ballynahinch

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Ballynahinch, as reported by local LeadsDoWork members.

Bricklayers installation cost in Ballynahinch 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in June 2025

Bricklayers Projects in Ballynahinch in May 2025

138

Requests for quotations in Ballynahinch in May 2025

0

Requests for Bricklayers quotations in Ballynahinch in May 2025. 0% change from April 2025.

0

Requests for Bricklayers quotations in County Down in May 2025. 0% change from April 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Ballynahinch May 2025

Northern Ireland is the Irish area of the United Kingdom, with the Republic of Ireland providing the remainder of the island. It comes with a population of just over 1.8 million, plus a population density of 133 people per square kilometre. This population is just 3% of the United Kingdom and 28% of people on the island of Ireland. Northern Ireland’s capital city of Belfast holds the most significant population of around 340,000, while Derry and Lisburn have 100,000 and 45,000 respectively. For all your home improvement projects in Northern Ireland, use reputable specialists to make sure you get a high-quality finish.

Looking for Bricklayers in Ballynahinch?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Ballynahinch

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ballynahinch.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Placholder Image

Other Top Projects in Ballynahinch

Customer Reviews

Overall rating:


Ballynahinch Bricklayers installers are rated 0 out of 5 based on 0 reviews of 7 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Ballynahinch Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
How the 0% VAT Scheme is Making Air Conditioning More Affordable for UK Homes Published: 14/04/2025 If you’ve ever considered installing air conditioning in your home but hesitated because of the cost, there’s now a significant reason to reconsider. Thanks to ... Read this article

Are you a builder in Ballynahinch?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today