
J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will require brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For some conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the house.
This brick wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the external brickwork walls, they might require supplemental insulation. This is usually achieved by adding internal wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.
In contrast to many ideas, a bricklayer really does more than laying of bricks. There's more to being a bricklayer than you can probably consider. A single bricklaying projects requires a large variety of abilities. Allow's look at these skills!
This is not only an cosmetic decision, as matching existing brickwork is potentially a condition of planning permission or building regulations in your area. We will offer approximately four Bricklayers pros in your area, that will supply quotes for the job you desire done. You'll receive a property visit from specialists in Bankside who'll help you to choose the ideal Bricklayers for your home before performing the installation. Enter your postal code to start browsing currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Bankside in April 2025
Requests for Bricklayers quotations in Bankside in April 2025. 0% change from March 2025.
Requests for Bricklayers quotations in London County in April 2025. 0% change from March 2025.
Bankside is a district in the London Borough of Southwark. It's positioned on the southern bank of the River Thames, 2.4 km east of Charing Cross. It's part of the business improvement district referred to as Better Bankside.
Bankside is the riverside of the former liberties of the Clink and Paris Garden. Throughout the Elizabethan period, these areas were outside the City of London’s jurisdiction so they became the homes of bear baiting pits and playhouses, such as the Rose, the Swan and the Globe Theatre. There has been a lot of regeneration in recent years, becoming well-known with tourists. The skyline of Bankside is accentuated by the former Bankside Power Station, which is now the Tate Modern.
The Bankside 1/2/3 complex on Southwark Street is the most important new development in the district. The 3 buildings house about 5,000 personnel. Bankside 1 is also called the Blue Fin Building and it's partially occupied by IPC Media, while Bankside 2 and 3 are occupied by the Omnicom Group Ltd.
From 2010, a lot of improvement schemes have transformed Blackfriars Road from the bridge towards the south at St. George’s Circus and new buildings stand in place of post-World War II offices. These buildings are residential and hotel accommodation along its length, particularly at the junction with Stamford Street where a lot of high rises have been built.
He is very keen
London - SE1
Enquiry from: Max A
Start Date: Immediate
Brickwork repair, ladder needed as on first floor. Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the ...
Pinner - HA5
Enquiry from: V
Start Date: Immediate
walk in front garden and side of wall are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be...
Hounslow - TW4
Enquiry from: Anthony B
Start Date: Immediate
rebuild wall which was blown down by last weekend’s storm. 6.5m long x 2.7m height two brick thick. are you the property owner: owner of the property property type: semi detached how much work would...
Hounslow - TW5
Enquiry from: Rizwan S
Start Date: Immediate
micro-digger hire for a day cost on it's own and also with operator. are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: brick wo...
Hounslow - TW3
Enquiry from: Abubakar A
Start Date: Immediate
we're looking to take down fences and its foundation and replace it with brick wall. the garden is quite large so we need advise on best solution and quotes for completing the job. are you the proper...
Feltham - TW13
Enquiry from: Mario M
Start Date: Immediate
to build an extension 6m x 6m with a roof lantern and bi fold doors. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: mediu...
Southall - UB2
Enquiry from: Aurangzeb C
Start Date: Immediate
I have a brick wall to the side of my semi detached property "shared" with neighbor. It is approximately 8metres long and am looking for a rebuild of the wall or a portion to be rebuilt to a 1.5 metre...
Hayes - UB3
Enquiry from: Samarawickrama S
Start Date: Immediate
Homeowner Please contact to appoint
Hounslow - TW3
Enquiry from: Sandy A
Start Date: Immediate
I need somebrickwork a d rendering on the front of the dormer please
Hayes - UB3
Enquiry from: Sylvia G
Start Date: Immediate
Driveway and front garden wall needs replacing. Current wall stood at about 36 inches with a London shape. Are you the property owner: Tenant (with permission) Property Type: Semi detached How much w...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Bankside.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today