
J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the house.
This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. Normally, this is achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.
Contrary to many ideas, a bricklayer really does more than laying of bricks. There's more to being a bricklayer than you can probably think about. A single bricklaying projects calls for a large variety of abilities. Let's take a look at these abilities!
This is not just an cosmetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros locally, who will offer quotes for the job you desire done. You'll obtain a home visit from experts in Newham that'll help you to select the right Bricklayers for your house before accomplishing the installation. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Newham in May 2025
Requests for Bricklayers quotations in Newham in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in London County in May 2025. 0% change from April 2025.
The London Borough of Newham is a London borough within east London. It's roughly 5 miles (8 km) east of the City of London, north of the River Thames. The borough was formed by merging the previous area of the Essex county borough of East Ham plus the county borough of West Ham as a borough of the newly formed Greater London, on 1 April 1965. Green Street and Boundary Road mark the former boundary between the two. North Woolwich also became a part of the borough, which was previously within the Metropolitan Borough of Woolwich, south of the River Thames within the County of London, in addition to a small area west of the River Roding which had previously been a part of the Municipal Borough of Barking.
The borough covers an overall area of 13.98 square miles. According to population estimates made during 2014, Newham is a borough with a permanent population of about 324322 inhabitant. In line with the 2011 Census, Newham has the youngest overall population in the nation. Transport in Newham is undergoing a significant upgrade, with the completed Docklands Light Railway and Jubilee Line Extension, and new or enhanced stations at Canning Town, West Ham and Stratford. The Docklands Light Railway was extended to serve London City Airport.
Newham was among the six host boroughs for the 2012 Summer Olympics and contains many of the Olympic Park which includes the Olympic Stadium.
He is very keen
London - E16
Enquiry from: Suzy O
Start Date: Immediate
cracks in boundary brick wall needs fixing. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job
London - E3
Enquiry from: Christine L
Start Date: Immediate
small skip to remove brick planter, access is limited to 3m width
Borehamwood - WD6
Enquiry from: Susan L
Start Date: 1 to 3 months
customer in borehamwood area has requested that we arrange quotes for their building maintenance project.mrs are considering various options and would like to discuss with a builder directly.please ca...
Harrow - HA1
Enquiry from: Deanna H
Start Date: Immediate
I need the my front garden wall redone Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks ...
Edgware - HA8
Enquiry from: Alpa P
Start Date: Immediate
Property owner Please call to appoint
London - W5
Enquiry from: Mike P
Start Date: 1 to 3 months
1) Removing and reseating the top 3 courses of bricks on the second floor wall tops which include some arched red brick window supports approx. 20 linear metres 2) Repointing to approximately 100sqm ...
Harrow - HA3
Enquiry from: Tim O
Start Date: 1 to 3 months
Part of front wall of the property need rebuilding and gate replaced (insurances claim) Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs...
Borehamwood - WD6
Enquiry from: Melvyn P
Start Date: Less than one month
To complete 3 walls with Brick Slips The walls are 2.4m x 3.6m,2.3m x 8.9m and 1.76m x 3m. Brick slips to be supplied. After completion, all 3 walls to be sealed Are you the property owner: Owner o...
London - W13
Enquiry from: Gordhan N
Start Date: Immediate
single storey side extension and rear double storey extension
Edgware - HA8
Enquiry from: Art H
Start Date: Immediate
Build 2 extension walls 100mm blocks on the flat 12.4 long x 2m high.(1000 blocks) 3 walls total 12.2 long by 2.7 high standard build (on edge) 330 blocks. Are you the property owner: Owner of th...
London - W5
Enquiry from: C
Start Date: Immediate
rebuild low brick wall in front garden and make concrete stand for wheelie bins.
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Newham.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today