
J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the house.
This solid wall will require foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. Normally, this is achieved with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.
Contrary to many ideas, a bricklayer really does more than laying of bricks. There's more to being a bricklayer than you can probably think about. A single bricklaying projects calls for a large variety of abilities. Let's take a look at these abilities!
This is not just an cosmetic decision, as coordinating with existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros locally, who will offer quotes for the job you desire done. You'll obtain a home visit from experts in Newham that'll help you to select the right Bricklayers for your house before accomplishing the installation. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Newham in April 2025
Requests for Bricklayers quotations in Newham in April 2025. 0% change from March 2025.
Requests for Bricklayers quotations in London County in April 2025. 0% change from March 2025.
The London Borough of Newham is a London borough within east London. It's roughly 5 miles (8 km) east of the City of London, north of the River Thames. The borough was formed by merging the previous area of the Essex county borough of East Ham plus the county borough of West Ham as a borough of the newly formed Greater London, on 1 April 1965. Green Street and Boundary Road mark the former boundary between the two. North Woolwich also became a part of the borough, which was previously within the Metropolitan Borough of Woolwich, south of the River Thames within the County of London, in addition to a small area west of the River Roding which had previously been a part of the Municipal Borough of Barking.
The borough covers an overall area of 13.98 square miles. According to population estimates made during 2014, Newham is a borough with a permanent population of about 324322 inhabitant. In line with the 2011 Census, Newham has the youngest overall population in the nation. Transport in Newham is undergoing a significant upgrade, with the completed Docklands Light Railway and Jubilee Line Extension, and new or enhanced stations at Canning Town, West Ham and Stratford. The Docklands Light Railway was extended to serve London City Airport.
Newham was among the six host boroughs for the 2012 Summer Olympics and contains many of the Olympic Park which includes the Olympic Stadium.
He is very keen
London - E16
Enquiry from: Suzy O
Start Date: Immediate
cracks in boundary brick wall needs fixing. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job
London - E3
Enquiry from: Christine L
Start Date: Immediate
small skip to remove brick planter, access is limited to 3m width
Borehamwood - WD6
Enquiry from: Susan L
Start Date: 1 to 3 months
customer in borehamwood area has requested that we arrange quotes for their building maintenance project.mrs are considering various options and would like to discuss with a builder directly.please ca...
Harrow - HA1
Enquiry from: Deanna H
Start Date: Immediate
I need the my front garden wall redone Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks ...
Edgware - HA8
Enquiry from: Alpa P
Start Date: Immediate
Property owner Please call to appoint
London - W5
Enquiry from: Mike P
Start Date: 1 to 3 months
1) Removing and reseating the top 3 courses of bricks on the second floor wall tops which include some arched red brick window supports approx. 20 linear metres 2) Repointing to approximately 100sqm ...
Harrow - HA3
Enquiry from: Tim O
Start Date: 1 to 3 months
Part of front wall of the property need rebuilding and gate replaced (insurances claim) Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs...
Borehamwood - WD6
Enquiry from: Melvyn P
Start Date: Less than one month
To complete 3 walls with Brick Slips The walls are 2.4m x 3.6m,2.3m x 8.9m and 1.76m x 3m. Brick slips to be supplied. After completion, all 3 walls to be sealed Are you the property owner: Owner o...
London - W13
Enquiry from: Gordhan N
Start Date: Immediate
single storey side extension and rear double storey extension
Edgware - HA8
Enquiry from: Art H
Start Date: Immediate
Build 2 extension walls 100mm blocks on the flat 12.4 long x 2m high.(1000 blocks) 3 walls total 12.2 long by 2.7 high standard build (on edge) 330 blocks. Are you the property owner: Owner of th...
London - W5
Enquiry from: C
Start Date: Immediate
rebuild low brick wall in front garden and make concrete stand for wheelie bins.
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Newham.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today