
J Alexander Building and Maintenance
Based: in Barking, IG11 9JNLatest review
G., IG6
Building work | Bricklaying in Ilford
He is very keen
Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with one or two windows is put into the front or side of the home.
This solid wall will require foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the external brickwork walls, they might require extra insulation. Normally, this is done by adding internal wall insulation like insulated plasterboard, or with the addition of a supplementary layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if the walls are shared with a neighbour's property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.
As opposed to numerous beliefs, a bricklayer in fact does more than laying of bricks. There's even more to being a bricklayer than you can probably consider. A solitary bricklaying jobs requires a broad variety of skills. Allow's look at these abilities!
This is not simply an visual choice, as matching existing brickwork is potentially a condition of planning permission or building regulations in your area. We will offer approximately four Bricklayers pros in your area, that will provide quotes for the work you want done. You'll receive a property visit from professionals in Barkingside that'll help you to pick the right Bricklayers for your house before executing the installment. Enter your postal code to begin browsing currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Barkingside in May 2025
Requests for Bricklayers quotations in Barkingside in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in London County in May 2025. 0% change from April 2025.
Barkingside is a district of Ilford within the London Borough of Redbridge in north east London. It was a part of Essex until Redbridge was created in 1965. It is primarily known for Barnardo’s, the children’s charity, which was founded there in 1866. It continues to have its headquarters there. The oldest buildings in Barkingside are the Barnardo’s chapel, the London Underground station and Holy Trinity Church. Barkingside is a diverse district, with an unusually high population of London’s Jewish community.
Many of the buildings along the High Street are owned by Lord Alan Sugar, and there are numerous other amenities within the district. The Fullwell Cross Library is a Grade II listed building, fashioned in a distinctive circular shape. A leisure centre also holds the same name. Ken Aston Square was opened in 2014, named after a local head teacher and football referee, believed to have introduced red and yellow cards. Residents chose the name from a shortlist.
Redbridge FC play non-league football at the Oakside stadium, which is adjacent to Barkingside tube station. Barkingside Recreational Ground in Mossford Green is a well-liked open space with residents. Also, footballer Trevor Brooking who played for West Ham United and England attended Ilford County High School in the area. Scott Malvern, British Racing driver, also was born in Barkingside and attended Caterham High School, which is a sports academy attended by youth team players of West Ham.
He is very keen
Ilford - IG1
Enquiry from: Giuseppe B
Start Date: Immediate
repointing of first floor back facade of a standard terraced house. possibly some brick repair. repair of the 2 window sills if needed are you the property owner: owner of the property property type: ...
Ilford - IG1
Enquiry from: Justin W
Start Date: Immediate
repairs to damaged garden wall. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: small job do you require the bricks to be ...
Ilford - IG2
Enquiry from: Christopher M
Start Date: Less than one month
Rebuild columns of gate and connect with railing Are you the property owner: Owner of the property Property Type: Terrace How much work would you say needs to be done: Small job Do you require the br...
Ilford - IG2
Enquiry from: A
Start Date: Immediate
3 pillows to build up and closing the garden wall, where now exist a little gate (about 300 bricks)
Ilford - IG6
Enquiry from: G
Start Date: Immediate
Rear Extension Brick work only, 2 Walls 6M X 2.5M 1 Wall 5.2M X 2.5M
London - SW6
Enquiry from: Emily S
Start Date: Immediate
repointing whole back side of victorian house, ***m, brick are you the property owner: owner of the property property type: terrace what type of work do you need to have done: brick work do you have t...
London - NW6
Enquiry from: Wael A
Start Date: Immediate
repointing of side wall of a victorian terrace and a chimney. are you the property owner: owner of the property property type: terrace what type of work do you need to have done: brick work do you ha...
London - N3
Enquiry from: Lee-Anne H
Start Date: Less than one month
render needs removing, brickwork underneath needs fixing and new render on top are you the property owner: owner of the property what type of work do you need to have done: brick work do you have the ...
London - SW6
Enquiry from: Shahida N
Start Date: Immediate
Re-pointing and repair gutter.
London - NW10
Enquiry from: James B
Start Date: 1 to 3 months
Great, so where are you looking to have the work done? Build Wall Supply skips in order to remove existing fencing. Approximately 40 meters long. Supply bricks and rest of the materials, Double brick...
Barnet - EN5
Enquiry from: Sam S
Start Date: Immediate
Customer made an online enquiry for Bricklaying via one of our websites. Confirmed via SMS/. Please call to arrange an appointment to quote.
London - NW11
Enquiry from: Hazel L
Start Date: Immediate
Rear garden - to build a wall with concrete slabs 12' long and 7' high. No need to paint the slabs.
London - N3
Enquiry from: Ervin H
Start Date: Immediate
home owner replace existing retaining wall 12m long approx supplied & fitted time scale- immediate please call to appoint *
London - N3
Enquiry from: H
Start Date: Immediate
Removal of existing wooden wall (close to collapse) which holds up a raised flower bed. Approx 1m tall and 6m long. Replace this wooden wall with a brick/block wall properly rendered and supported. E...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Barkingside.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today