Bricklaying in Hebburn

Discover Bricklaying Prices in Hebburn

Home > General Building Projects > Bricklayers > Hebburn

Bricklaying in Hebburn

Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a brick wall with a couple of windows is put into the front or side of the home.

 

This solid wall will demand foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into consideration. Depending on the current thickness of the exterior brickwork walls, they may require extra insulation. This is usually achieved with the addition of internal wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the home.

 

As opposed to several beliefs, a bricklayer actually does more than laying of blocks. There's more to being a bricklayer than you can most likely think about. A solitary bricklaying tasks calls for a large selection of skills. Let's have a look at these skills!

  • Utilizing wet resistant materials to secure foundations.
  • Spreading mortar between joints and also applying them to serve as a thick layer binding the bricks together in rows.
  • Reviewing and working from specs in addition to plans.
  • Working with brick-cutting machines.
  • Taking charge and also caring for concrete blocks or blocks, clay bricks as well as the likes.
  • Building of scaffolding - subject to property of some licenses in some states.

This is not only an aesthetic choice, as matching existing brickwork is possibly a condition of planning permission or building regulations in your area. We will give approximately 4 Bricklayers pros in your area, who will use quotations for the job you desire done. You'll receive a home visit from specialists in Hebburn that'll assist you to pick the best Bricklayers for your house before carrying out the installation. Enter your postal code to start looking now.

Average Bricklayers cost in Hebburn

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Hebburn, as reported by local LeadsDoWork members.

Bricklayers installation cost in Hebburn 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in June 2025

Bricklayers Projects in Hebburn in May 2025

410

Requests for quotations in Hebburn in May 2025

0

Requests for Bricklayers quotations in Hebburn in May 2025. 0% change from April 2025.

0

Requests for Bricklayers quotations in Tyne And Wear in May 2025. 0% change from April 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Hebburn May 2025

Hebburn

Hebburn is a town resting on the south bank of the River Tyne in North East England, set between the towns of Jarrow and Bill Quay. In accordance with the 2011 Census, it has a population of 18808. The town was formerly a part of County Durham, with the name believed to come from Old English, signifying 'high burial mount'. Hebburn has actually been dated back to the 8th century, where the first record relates to a settlement of fishermen's huts burned by the Vikings. The town has a long industrial history. Coal was extracted in Hebburn from approximately the early 17th century. The Hebburn Colliery launched in 1792, which expanded to subsequently operate 3 pits. Hebburn is additionally known for its shipbuilding history. The A. Leslie and Company constructed several Royal Navy battle ships, with the most widely known being the HMS Kelly in 1938. In the present day, the town boasts lots of retail centres, and there is a range of leisure options accessible to citizens. It is home to Hebburn Town F.C., established in 1912, and Hebburn Reyrolle F.C., which are the town's non-league football teams. Athletics is an activity that is commonly taken part in and viewed as a result of the Monkton Stadium, which hosts the Hebburn Athletic Club. In 2012, the BBC commissioned a television series called 'Hebburn', which was set in the town. Jason Cook, the show's developer and co-writer, lived in Hebburn as he was growing up. For all your home upgrades, make sure to make use of reputable contractors in Hebburn to make certain of quality.

Looking for Bricklayers in Hebburn?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Hebburn

15 Sep

Building work | Bricklaying

Hebburn - NE31

Enquiry from: Donna J

Start Date: Immediate

rebuild a garden wall. approx 7-8ft lo*** high are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do you require the bric...

Post a similar request >

12 Feb

Building work | Bricklaying

Sunderland - SR3

Enquiry from: Heather F

Start Date: Immediate

Brick gatepost and approx 1.5m of brick wall knocked down by an accident. Need it rebuilt asap as House sale completion is next week

Post a similar request >

09 Dec

Building work | Bricklaying

Chester le Street - DH3

Enquiry from: John O

Start Date: 1 to 3 months

brick gatepost repair/rebuild are you the property owner: owner of the property property type: detached what type of work do you need to have done: brick work do you have the materials you need in or...

Post a similar request >

08 Jun

Building work | Bricklaying

Stanley - DH9

Enquiry from: Carl N

Start Date: Immediate

garden wall rebuild - 13ft x 9ft. supply of materials and removal of rubble. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: me...

Post a similar request >

22 Jan

Building work | Bricklaying

Washington - NE38

Enquiry from: John A

Start Date: Immediate

remove old boundary fencing, replace with brick pillers and partcial fence panels. are you the property owner: owner of the property property type: detached how much work would you say needs to be don...

Post a similar request >

23 Aug

Building work | Bricklaying

Washington - NE38

Enquiry from: Rita M

Start Date: Immediate

brickwork in arch over porch door has started to slip. porch is single storey with about 3 courses of brick over the arch and under a flat roof. i think the arch will need rebuilding. are you the prop...

Post a similar request >

09 Aug

Building work | Bricklaying

Chester le Street - DH3

Enquiry from: Sharon L

Start Date: Immediate

repair to internal bedroom wall are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: medium job do you require the bricks to be suppli...

Post a similar request >

14 Nov

Building work | Bricklaying

Seaham - SR7

Enquiry from: David T

Start Date: Immediate

Build a yard wall

Post a similar request >

14 Jul

Building work | Bricklaying

Sunderland - SR3

Enquiry from: Alan T

Start Date: Less than one month

Alteration to external and internal wall on kitchen and roof to change shape layout of kitchen Are you the property owner: Owner of the property Property Type: Terrace Do you require the bricks to be ...

Post a similar request >

22 May

Building work | Bricklaying

Sunderland - SR4

Enquiry from: DAVID J

Start Date: Less than one month

I am looking to improve the boarder wall at the front and back of my property, also i need a wall built between my property and the house next door at the front of my house. I would like metal railin...

Post a similar request >

14 Sep

Building work | Bricklaying

Seaham - SR7

Enquiry from: Andrew S

Start Date: Immediate

Damp course and chimney breast removed (chimney above roof already removed) and lintel required. Contact me ASAP please, as I would like to start ASAP also. Are you the property owner: Owner of t...

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Hebburn

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Hebburn.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Hebburn

Customer Reviews

Overall rating:


Hebburn Bricklayers installers are rated 0 out of 5 based on 0 reviews of 6 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Hebburn Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
How the 0% VAT Scheme is Making Air Conditioning More Affordable for UK Homes Published: 14/04/2025 If you’ve ever considered installing air conditioning in your home but hesitated because of the cost, there’s now a significant reason to reconsider. Thanks to ... Read this article

Are you a builder in Hebburn?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today