Bricklaying in Stromness

Obtain Bricklaying Prices in Stromness

Home > General Building Projects > Bricklayers > Stromness

Bricklaying in Stromness

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the home.

 

This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the external brickwork walls, they might require extra insulation. This is usually done with the addition of internal wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. In addition, if the walls are shared with a neighbour, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.

 

Contrary to several ideas, a bricklayer actually does more than laying of blocks. There's more to being a bricklayer than you can possibly think about. A solitary bricklaying jobs calls for a wide array of abilities. Let's have a look at these skills!

  • Making use of moist resistant materials to seal structures.
  • Spreading mortar in between joints and also using them to serve as a thick layer binding the bricks together in rows.
  • Reviewing as well as working from specs as well as plans.
  • Working with brick-cutting machines.
  • Taking charge and also taking care of cement blocks or bricks, clay bricks as well as the likes.
  • Building of scaffolding - subject to property of some licenses in some states.

This is not just an visual choice, as matching existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will supply approximately 4 Bricklayers pros in your area, that will supply quotes for the work you desire done. You'll obtain a home visit from experts in Stromness that'll assist you to choose the right Bricklayers for your home prior to accomplishing the setup. Enter your postal code to start browsing currently.

Average Bricklayers cost in Stromness

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Stromness, as reported by local LeadsDoWork members.

Bricklayers installation cost in Stromness 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in May 2025

Bricklayers Projects in Stromness in April 2025

90

Requests for quotations in Stromness in April 2025

0

Requests for Bricklayers quotations in Stromness in April 2025. 0% change from March 2025.

0

Requests for Bricklayers quotations in Orkney Islands in April 2025. 0% change from March 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Stromness April 2025

Stromness

Stromness is the second-most populous community in Orkney, Scotland. It remains in the southwestern part of Mainland Orkney. It is a burgh with a parish around the outdoors with the town of Stromness as its capital. A long-standing port, Stromness has a population of roughly 2,190 citizens. The old town is clustered along the colorful and winding main street, flanked by houses and also shops built from regional stone, with narrow lanes as well as alleys branching off it. There is a ferryboat link from Stromness to Scrabster on the north coastline of mainland Scotland. First recorded as the site of an inn in the 16th century, Stromness came to be crucial during the late seventeenth century, when Great Britain went to battle with France and also delivery was forced to prevent the English Channel. Ships of the Hudson's Bay Company were regular site visitors, as were whaling fleets. Large numbers of Orkneymen, much of whom came from the Stromness location, acted as traders, travelers as well as seafarers for both. Captain Cook's ships, Discovery as well as Resolution, called at the town in 1780 on their return trip from the Hawaiian Islands, where Captain Cook had been eliminated. Stromness Museum mirrors these facets of the town's background (displaying for example vital collections of whaling antiques, as well as Inuit artefacts brought back as mementos by neighborhood males from Greenland and Arctic Canada). An uncommon aspect of the town's character is the a great deal of buildings embellished with displays of whale bones outside them. At Stromness Pierhead is a celebratory sculpture by North Ronaldsay carver Ian Scott, unveiled in 2013, of John Rae standing erect, with an inscription describing him as "the discoverer of the final link in the first navigable Northwest Passage".

Looking for Bricklayers in Stromness?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Stromness

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Stromness.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Stromness

Customer Reviews

Overall rating:


Stromness Bricklayers installers are rated 0 out of 5 based on 0 reviews of 0 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Stromness Bricklayers contractors
Garden wall construction with London Heather bricks in Crawley Published: 22/01/2025 Looking to complete a garden wall construction in Crawley? Learn about the materials, process, and cost-effective options for your bricklaying project. Read this article
Garden wall repair and repointing in West Bromwich Published: 23/11/2024 Repair of two garden walls and repointing of a third wall needed for a terrace home in West Bromwich. Includes supply of new bricks and waste removal. Learn more about the process and costs. Read this article
How the 0% VAT Scheme is Making Air Conditioning More Affordable for UK Homes Published: 14/04/2025 If you’ve ever considered installing air conditioning in your home but hesitated because of the cost, there’s now a significant reason to reconsider. Thanks to ... Read this article

Are you a builder in Stromness?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today