Building work | Bricklaying
Torquay - TQ1
Enquiry from: David M
Start Date: Immediate
Convert old bathroom, toilet and bedroom into 1 large bathroom suite
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of your home.
This brick wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into account. Depending on the current thickness of the outer brickwork walls, they might require additional insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.
In contrast to numerous ideas, a bricklayer actually does more than laying of blocks. There's more to being a bricklayer than you can most likely think of. A single bricklaying projects calls for a wide selection of abilities. Let's look at these skills!
This is not merely an aesthetic decision, as complementing existing brickwork might be a condition of planning permission or building regulations in your area. We will supply as much as 4 Bricklayers pros in your area, that will offer quotations for the job you want done. You'll get a home visit from experts in Torquay who'll assist you to pick the best Bricklayers for your home prior to carrying out the installment. Enter your postal code to start looking currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
| Avg. price low | Avg. price low |
|---|---|
| Avg. price | Avg. price |
| Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
| Labour cost | £280 | |
| Material cost | £100 | |
| Waste removal | £20 |
Requests for quotations in Torquay in June 2026
Requests for Bricklayers quotations in Torquay in June 2026. 0% change from May 2026.
Requests for Bricklayers quotations in Devon in June 2026. 0% change from May 2026.
Torquay possesses a populace of 63,988 and is a seaside town inside the ceremonial county of Devon in England's southwest. The town is placed 22 miles south of Exeter and is also inside the unitary authority of Torbay. A 2001 review affirmed the town's reputation as a retirement region, with 26% of the population aged over 60. No matter what home improvements you're looking for in the Torquay area, make sure you use vetted and respected business experts to get the right price and a top quality finish.
Torquay - TQ1
Enquiry from: David M
Start Date: Immediate
Convert old bathroom, toilet and bedroom into 1 large bathroom suite
Brixham - TQ5
Enquiry from: Des H
Start Date: Immediate
Concrete block walls =carport
Exmouth - EX8
Enquiry from: Raymond B
Start Date: Immediate
a blockwork retaining wall at the end of my garden replacing an old dilapidated wall. 9m long and 1.7 high. property type: detached how much work would you say needs to be done: medium job do you requ...
Budleigh Salterton - EX9
Enquiry from: Terri P
Start Date: Immediate
we need two brick pillars on our driveway (to mount new electric gates). we are keen the brickwork is in keeping with our house - built 1920s - probably designed by hatchard smith. are you the prope...
Brixham - TQ5
Enquiry from: Sandra B
Start Date: Immediate
patio outside wall unstable after the removal of recent ivy, the present wall has nothing stable to sit on and is crumbling are you the property owner: owner of the property property type: terrace do ...
Paignton - TQ3
Enquiry from: Shaun B
Start Date: Immediate
Dig out approx 180tonnes of soil & remove stairs leading up to property, build retaining walls with bare block work and construct new staircase leading up to property. I’ll gravel base of driveway m...
Newton Abbot - TQ12
Enquiry from: Martin B
Start Date: 1 to 3 months
Just a bricklayer needed got all the Materials xx xx Block and bricklay a U shape retainer wall 141inches long 130 inches with Are you the property owner: Tenant (with permissi...
Exmouth - EX8
Enquiry from: John S
Start Date: Immediate
need 5 metres of cavity trays fitting.... scaffolding in place, my bricky has been delayed.
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Torquay.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love Local Quotes it's a big part of my Business I would recommend to anyone
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today