Building work | Bricklaying
Tredegar - NP22
Enquiry from: Paul F
Start Date: Immediate
Wants a front wall call to appoint
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is put into the front or side of the home.
This solid wall will demand foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will likely require extra insulation. Normally, this is done with the addition of interior wall insulation like insulated plasterboard, or by adding an extra layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.
As opposed to many beliefs, a bricklayer in fact does greater than laying of bricks. There's more to being a bricklayer than you can probably think of. A single bricklaying projects calls for a vast selection of skills. Allow's look at these abilities!
This is not simply an aesthetic decision, as matching existing brickwork is potentially a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros locally, who will certainly provide quotations for the job you desire done. You'll obtain a home visit from professionals in Tredegar that'll assist you to choose the best Bricklayers for your house before accomplishing the setup. Enter your postcode to start searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Tredegar in April 2025
Requests for Bricklayers quotations in Tredegar in April 2025. 0% change from March 2025.
Requests for Bricklayers quotations in Gwent in April 2025. 0% change from March 2025.
The community and neighborhood of Tredegar remains on the Sirhowy River in the county Borough of Blaenau Gwent in southeast Wales. Located within the historic boundaries of Monmouthshire, it became an early centre of the Industrial Revolution in South Wales. According to the 2011 Census, Tredegar has a long-term population of around 15,103. The town's name can be interpreted as 'tref deg erw' which is believed to translate as 'ten acres ranch'. From a very early time, the community's advancement was helped by its closeness to several natural deposits had within the Sirhowy Valley, such as iron ore, coal for the manufacturing of coke, power from the fast-flowing Sirhowy River and also wood for buildings, pit props and also fuel. Thus, the Sirhowy Valley was a well established woody valley by 1700, including a number of ranches and also a couple of iron jobs. The official growth of iron works occurred from the center of the 18th century, when The Sirhowy Iron Works was built in 1750. Over time, it was offered and acquired to various other proprietors, that created it as the very first coal discharged furnace, which demanded utilizing males to dig coal. Various other firms were quickly to comply with, as shown by the Tredegar Iron Company, established in 1800. There are a variety of spots found in the town. Erected in 1818 as your home of Samuel Homfray, whose Iron and Coal Works were the leading neighborhood companies, Bedwellty House is a Grade II listed residence as well as gardens. The Town Clock is one more noteworthy function of the community, which controls the horizon of the southerly component of the community centre. For all of your residence upgrades, make certain to take advantage of reliable specialists in Tredegar to make sure of quality.
Tredegar - NP22
Enquiry from: Paul F
Start Date: Immediate
Wants a front wall call to appoint
Merthyr Tydfil - CF48
Enquiry from: Michael Q
Start Date: Immediate
repair/reset brick gate post and reset gate hatch area = small gate entrance area are you the property owner: owner of the property property type: semi detached how much work would you say needs to be...
Aberdare - CF44
Enquiry from: Jason L
Start Date: Immediate
had welder to secure. balcony gate to wall but the bricks were lose and broke up need bricks repaired under patio doors are you the property owner: owner of the property property type: other how much ...
Pontypridd - CF37
Enquiry from: Ashley B
Start Date: 1 to 3 months
i have an extension kitchen/bathroom. i have found that a wooden beam at the back of the extension has rotted. i would like a price to repair/replace are you the property owner: owner of the property ...
Pontypridd - CF37
Enquiry from: Steve D
Start Date: Immediate
built walls, steps and path in the sloping garden are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you require...
Pontypridd - CF38
Enquiry from: Bert N
Start Date: 1 to 3 months
To build a small attached extension to house Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the b...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Tredegar.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today