Bricklaying in Merton

Get Bricklaying Prices in Merton

Home > General Building Projects > Bricklayers > Merton

Bricklaying in Merton

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of your home.

 

This brick wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they'll require extra insulation. This is usually achieved with the addition of internal wall insulation like insulated plasterboard, or with the addition of another layer of brickwork to create a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if the walls are shared with a neighbouring property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.

 

Unlike lots of beliefs, a bricklayer in fact does more than laying of blocks. There's more to being a bricklayer than you can possibly consider. A single bricklaying tasks requires a wide selection of skills. Allow's have a look at these abilities!

  • Using wet resistant materials to seal structures.
  • Spreading mortar between joints and also using them to act as a thick layer binding the blocks together in rows.
  • Checking out and functioning from specs along with strategies.
  • Dealing with brick-cutting makers.
  • Taking charge and also taking care of concrete blocks or bricks, clay bricks and the likes.
  • Building and construction of scaffolding - subject to ownership of some licenses in some states.

This is not simply an visual choice, as coordinating with existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will supply approximately 4 Bricklayers pros in your area, who will certainly use quotations for the job you desire done. You'll obtain a property visit from specialists in Merton that'll assist you to choose the right Bricklayers for your home before performing the installation. Enter your postal code to begin searching currently.

Average Bricklayers cost in Merton

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2026

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Merton, as reported by local LeadsDoWork members.

Bricklayers installation cost in Merton 2026

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days
Advertisement

Bricklayers on Google in Merton

Google searches that showed Local Quotes, 17 July to 14 October 2026

48

Searches that showed our Bricklayers page for Merton

5,061

Searches that showed one of our pages for Merton, all services

Source: Google Search Console, the number of times our pages appeared in Google search results. It counts searches that showed the page, not quote requests.

Bricklayers searches near Merton, 17 July to 14 October 2026

12

Searches that showed our page for Wandsworth

10

Searches that showed our page for Battersea

Merton

The London Borough of Merton is a borough in south-west London, England. The borough was formed under the London Government Act 1963 in 1965 by the merger of the Municipal Borough of Mitcham, the Municipal Borough of Wimbledon and also the Merton and Morden Urban District, all formerly within Surrey. The borough derives its name from the historic parish of Merton, which was centred on the area now referred to as South Wimbledon. The local authority is Merton London Borough Council.

As outlined by population estimates made during 2014, the borough features a permanent population of about 203515 inhabitants. The borough is also served by numerous London Tramlink stops from Wimbledon, which goes to Croydon, New Addington, Elmers End and Beckenham. It is the only London Borough which has tube, rail and tram services.

The key industrial centres in Merton are Mitcham, Morden and Wimbledon, of which Wimbledon is the biggest. Other smaller sized centres consist of Raynes Park, Colliers Wood, South Wimbledon, Wimbledon Park and Pollards Hill. Every year, Wimbledon, one of the 4 tennis Grand Slam tournaments, is held at the All England Lawn Tennis and Croquet Club in Church Road Wimbledon. The occasion occurs over a fortnight at the end of June and start of July and it's the largest annual sporting occasion to take place in the United Kingdom, attracting over 200000 guests during the Wimbledon fortnight.

Looking for Bricklayers in Merton?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Merton

JM Fencing & Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

TC Construction

3 review(s)
Based: in Surrey, SM7 3HG

Are you looking for a driveway that offers something different? With expertise in high quality surfacing, TC Construction can help you get the look that you want. Domestic and commercial asphalting service With more than 30 years of experience,...

Latest review

Brian C., KT4
4

Bricklaying in Worcester Park

They were quick to communicate and came to look at the job quickly which is great

Similar Customer Enquiries for Bricklayers in and around Merton

03 Aug

Bricklayers

London - SE2

Enquiry from: Edyta R

Start Date: Immediate

Bricklayer to build a front garden brick wall required. Wall is 'L' shaped, in total around 8-9m long by 1m heigh, single skin with 8 single brick columns. The quote to include labour and bonding mate

Post a similar request >

12 Jun

Bricklayers

London - SW15

Enquiry from: Jackie C

Start Date: Immediate

We have a small brick post that needs to be replaced on top of a wall

Post a similar request >

18 Aug

Bricklayers

Morden - SM4

Enquiry from: AAA B

Start Date: Immediate

Underpinning contractor is required

Property: detached · When: immediate

Post a similar request >

20 Jan

Bricklayers

London - SW17

Enquiry from: Akhtar S

Start Date: Immediate

I'm in need of a brick layer, what are charges for block inner wall and brick on the outer wall. new extension at the rear of house 6 x 4 metres. 2 x 6m walls and 1 x 4m

Property: detached

Post a similar request >

Advertisement

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Merton

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Merton.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Quick contact

Quick contact

Left me with the necessary informat ...

Left me with the necessary information .

Put in touch with good competitive ...

Put in touch with good competitive companies

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Bricklayers

Other Top Projects in Merton

Are you a builder in Merton?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today