Bricklaying in Bromley

Find Bricklaying Prices in Bromley

Home > General Building Projects > Bricklayers > Bromley

Bricklaying in Bromley

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For most conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of the property.

 

This brick wall will require foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the outer brickwork walls, they will require supplemental insulation. Normally, this is done with the addition of internal wall insulation like insulated plasterboard, or with the addition of an extra layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the home.

 

As opposed to several beliefs, a bricklayer really does more than laying of bricks. There's more to being a bricklayer than you can probably consider. A solitary bricklaying projects needs a large variety of abilities. Allow's take a look at these skills!

  • Making use of moist resistant materials to secure structures.
  • Spreading mortar between joints and also using them to function as a thick layer binding the bricks together in rows.
  • Reading as well as functioning from requirements in addition to plans.
  • Working with brick-cutting machines.
  • Taking charge and caring for cement blocks or blocks, clay blocks and the sort.
  • Construction of scaffolding - subject to ownership of some licenses in some states.

This is not just an visual choice, as complementing existing brickwork could be a requirement of planning permission or building regulations in your area. We will provide up to 4 Bricklayers pros locally, that will offer quotations for the work you desire done. You'll obtain a home visit from experts in Bromley who'll help you to pick the best Bricklayers for your residence prior to carrying out the installation. Enter your postal code to start looking now.

Average Bricklayers cost in Bromley

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Bromley, as reported by local LeadsDoWork members.

Bricklayers installation cost in Bromley 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in June 2025

Bricklayers Projects in Bromley in May 2025

1,814

Requests for quotations in Bromley in May 2025

0

Requests for Bricklayers quotations in Bromley in May 2025. 0% change from April 2025.

0

Requests for Bricklayers quotations in Kent in May 2025. 0% change from April 2025.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Bromley May 2025

Bromley

The London Borough of Bromley is among the 32 London Boroughs which make up Greater London. The London Borough of Bromley is south of the River Thames which flows via London, the capital city of the UK. The borough was formed, as were all other London boroughs, on 1 April 1965 by the London Government Act 1963. It comprised the former region of the Municipal Borough of Bromley, the Municipal Borough of Beckenham, Penge Urban District, Orpington Urban District and the Chislehurst part of Chislehurst and Sidcup Urban District, which was transferred from Kent to Greater London. Bromley is the principal town in the London Borough of Bromley. It covers a total area of about 57.97 square miles. In line with the 2011 Census, the borough has a permanent population of about 309392 inhabitants. Within this population, most were owner-occupiers. About 32.5% own their residence outright and also a further 42.73 per cent own their home with a mortgage. A lot of the population lives in the north and west of the borough, with an outlier at Biggin Hill within the far south. The borough shares borders with the London Boroughs of Lewisham and Greenwich to the North, Bexley towards the North East, Southwark and Lambeth to the North West, as well as Croydon towards the West. Bromley is one of only six London Boroughs not to have at least one London Underground station inside its boundaries. However, the borough has several railway stations served by London Overground, Thameslink, Southeastern and Southern. The borough also has numerous stops around the London Tramlink network. For all your property upgrades, be certain that you employ trustworthy experts in Bromley to make sure that you get the best quality.

Looking for Bricklayers in Bromley?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Bromley

JM Fencing and Landscaping

89 review(s)
Based: in Farnham, GU10 1FD

Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening and Fencing. We pride ourselves in offering a prompt, efficient service and are always conscious of our customers needs. I alw...

Latest review

Sam L., RG14
5

Building work | Bricklaying in Newbury

Excellent - came on time, always very punctual. Did an excellent job, very tidy, cleaned up thoroughly afterwards. I wou...

J Alexander Building and Maintenance

1 review(s)
Based: in Barking, IG11 9JN

Latest review

G., IG6
4

Building work | Bricklaying in Ilford

He is very keen

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Bromley

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Bromley.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Do bricklayers need a license?

Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.

As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.

It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.

Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Bricklayers

Other Top Projects in Bromley

Customer Reviews

Overall rating:


Bromley Bricklayers installers are rated 4.2 out of 5 based on 9 reviews of 74 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Bromley Bricklayers contractors

Are you a builder in Bromley?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today