- Prepare the sub-base The driveway company will excavate, or dig, the existing surface down to a depth of around 200mm. They will remove any debris from the area may place it in a skip or arrange for it to be removed in another way. When they dig down to the sub-base of your previous driveway, they will assess how much hardcore they need and arrange for that to be delivered to the site. They will then spread the hardcore across the sub-base to create a level surface to pour the concrete on. Most good contractors will apply a gel to any walls and doors to protect them from concrete splashes. They will also add any gulley tops, manhole covers or shuttering that’s required.
- Installation and imprinting Next, the tradespeople will have the concrete either poured from a large mixer vehicle or barrow it in from a mixer and pour onto the surface. They level it with rakes, then add a colour surface hardener in a colour of your choice. This will give the driveway its permanent colour. They will then wait until the concrete has hardened to the correct consistency for imprinting the pattern, then will use special tools and stencils to make the pattern that you asked for. They will then spread a colour powder called a release agent over the surface, and leave to dry for 1 to 2 days depending on the weather conditions.
- Cleaning When the contractors return, they will add crack control cuts into the concrete. This is important because concrete expands and contracts in the heat, so there needs to be some give to stop any larger cracks from forming. Then everything is power washed clean, and a chemical wash is also used on the concrete to ensure it’s completely dust-free. The installers will ensure all your walls and doors are clean, which will hopefully be an easy job if they used wall gel.
- Sealing The final step is to seal the driveway. There needs to have been at least two dry days before the tradespeople can do it, so you might find it’s best to have your pattern imprinted driveway installed in the summer. The contractors will blow any debris away from the surface and dry any damp areas where necessary. They will then add an anti-slip agent to the sealant and brush it on. It’s best to not walk or drive onto your new concrete driveway for about 4 days after sealing to allow everything to set. But after that, you’re ready to use your new driveway!
Darvel
Darvel or Dervel (population 3,361) is a village in East Ayrshire, Scotland. It is at the eastern end of the Irvine Valley as well as is occasionally referred to as "The Lang Toon" (English: the Long Town). The community's Latin slogan, Non sibi sed cunctis, suggests "Not for ourselves, but for others". Darvel is situated on the A71 road that ranges from Irvine on the west coast to Edinburgh on the eastern. The town is 9 miles (14 km) eastern of Kilmarnock as well as is one of the most easterly of the Valley Towns, the others being Galston and also Newmilns. The community was additionally when linked with Stonehouse (using Strathaven) by the Caledonian Railway. Nevertheless, the line was nearby the LMS before the Second World War. The previous Glasgow and also South Western Railway branch line to Kilmarnock endured for much longer and also was closed in 1964 as part of the Beeching Axe. Much of the route of both the old train lines is still out there, although the rails have actually long since gone and lots of road bridges have actually been gotten rid of. There was a big viaduct to the east of the community, in the lea of Loudoun Hill, which lugged the railway line over the valley. This was nonetheless, demolished in 1986, and also only the piers stay. The River Irvine moves with the town and also when powered regional mills.