- Prepare the base If you want your resin bound driveway to last a long time, you need to ensure that you prepare the base properly. Remove any block paving, grass or soil and dig down until you hit solid ground. Lay a sub-base of asphalt for good permeability. If you’re laying over the top of your current driveway, make sure that all cracks are increased into a ‘v’ shape with a saw and ensure the surface is dry and weed-free.
- Mix the resin You must follow the instructions on the materials you have to the letter if you want the curing process to work. Usually batches come in ‘Part A’ and ‘Part B’. Keep the resin container secure and on a protective surface to avoid splashing, then mix Part A for 10-20 seconds at a slow speed with a helical bladed mixer. Add Part B and mix thoroughly at a slow speed for about 2 minutes until it’s blended together.
- Mix the dried aggregates and sand with the resin Place a quarter of the aggregates into a mixer, then add the pre-mixed resin and start a stopwatch. You should then add the rest of the aggregates before slowly adding the sand. When you’re happy with that mix, stop the stopwatch. That time is the time that you need to spend mixing any other resin and aggregates to avoid colour variation.
- Lay the mix on the surface Transfer the mix to the work area then plan a laying route. When the mix is laid out, use a very clean trowel to spread the mix. Clean it regularly during the process to avoid dragging aggregates out of place. Once the aggregates stop moving in a fluid movement and become solid, stop trowelling. Then you can polish the surface to give it an attractive shine.
Holt
Holt is a market town, civil parish and selecting ward in the English area of Norfolk. The town is 22.8 miles (36.7 kilometres) north of the city of Norwich, 9.5 miles (15.3 kilometres) west of Cromer as well as 35 miles (56 kilometres) eastern of King's Lynn. The town is on the course of the A148 King's Lynn to Cromer road. The closest train station remains in the town of Sheringham where accessibility to the national rail network can be made by means of the Bittern Line to Norwich. Holt additionally has a railway station on the maintained North Norfolk Railway, the 'Poppy Line', of which it is the south-western terminus. The local airport terminal is Norwich. The community has a population of 3,550, climbing and including the ward to 3,810 at the 2011 census. Holt is within the location covered by North Norfolk District Council.